Get vehicles to flush off the Thruway faster during snow events
speed traffic along a route parallel to the thruway during snow events
Enable thruway traffic to flush off the system faster at Interchange 56 and onto NY 179
Enable vehicles to flush off of the Thruway faster and into local communities during snow events
Speed traffic along a parallel route to the Thruway during snow events
Speed traffic along routes parallel to the Thruway during snow events.
priority development corridor
key east-west corridor spans entire city.
Elmwood/South Elmwood/Lower Terrace corridor. Access from northern suburbs thru museum district, college, business district, downtown and ultimately Canalside access. Hits on many categories.
Parallel path for incidents on NY 33. Airport access.
Cycle track is proposed as part of City's Bicycle Master Plan.
Coordination, congestion
The goal of improved safety combined with better progression thru the Bailey corridor go hand in hand. Pedestrian, transit also key.
No single category for this one. Key evacuation route, transit signal priority, pedestrian and bicycle safety. City will be constructing a cycle track from Busti to Hertel with bike signal phases.