Comments for “NITTEC TSMP Map”
-
Get vehicles to flush off the Thruway faster during snow events
Liked 0 times -
speed traffic along a route parallel to the thruway during snow events
Liked 0 times -
Enable thruway traffic to flush off the system faster at Interchange 56 and onto NY 179
Liked 0 times -
Enable vehicles to flush off of the Thruway faster and into local communities during snow events
Liked 0 times -
Speed traffic along a parallel route to the Thruway during snow events
Liked 0 times -
Speed traffic along routes parallel to the Thruway during snow events.
Liked 0 times -
Liked 0 times
-
Liked 0 times
-
Liked 0 times
-
Liked 0 times
-
Liked 1 time
-
Liked 0 times
-
priority development corridor
Liked 0 times -
Liked 0 times
-
Liked 0 times
-
Liked 0 times
-
Liked 0 times
-
Liked 0 times
-
key east-west corridor spans entire city.
Liked 0 times -
Elmwood/South Elmwood/Lower Terrace corridor. Access from northern suburbs thru museum district, college, business district, downtown and ultimately Canalside access. Hits on many categories.
Liked 0 times -
Parallel path for incidents on NY 33. Airport access.
Liked 1 time -
Cycle track is proposed as part of City's Bicycle Master Plan.
Liked 0 times -
Coordination, congestion
Liked 0 times -
The goal of improved safety combined with better progression thru the Bailey corridor go hand in hand. Pedestrian, transit also key.
Liked 0 times -
No single category for this one. Key evacuation route, transit signal priority, pedestrian and bicycle safety. City will be constructing a cycle track from Busti to Hertel with bike signal phases.
Liked 1 time