Comments for “Gardner Complete Streets Prioritization Plan”

← Back to the map

Comments Box

Please be as specific as possible

Your Information

This information is optional and will not be displayed.

  1. March 31 2017

    Upgrade all four corners to meet current ADA standards

    Liked 0 times
  2. March 31 2017

    Very busy intersection that serves as primary connection to E/W & N/S for drivers and walkers. Also route to Elm Street School (Grades 2-4). Possible geometric/pedestrian/traffic improvement project

    Liked 1 time
  3. March 31 2017

    Meeting with MWCC revealed interest in bike share program (HUBway or Zagster) that could benefit students

    Liked 0 times
  4. March 31 2017

    Meeting with MWCC revealed MART buses stop running in late afternoon which poses challenge for students attending evening events at college

    Liked 0 times
  5. March 31 2017

    Wide paved width presents opportunity to delineate parking/bicycle corridor to connect Greenwood Park to Wilder Field

    Liked 0 times
  6. March 31 2017

    Possible upgrade along one side to include sidewalk, better lighting and safe access to Waterford Street School and Wilder Field (PreK, K, 1st Grade)

    Liked 0 times
  7. March 31 2017

    Opportunity to modify recent improvements to intersection to better define entrance to park and provide compliant crossing of Parker Street to Marquette

    Liked 0 times
  8. March 31 2017

    There are no ADA compliant ramps to either sidewalks in NB or SB direction.

    Liked 0 times
  9. March 31 2017

    With two lanes NB and one SB and high traffic volume along Green Street - poses dangerous situation for peds/bikes to safely cross. Currently only warning sign and pavement markings. May want to consider upgrade to HAWK signal at this location

    Liked 0 times
  10. March 22 2017

    Consider upgrading WCR ramps to meet new ADA standards (3 crossings located here)

    Liked 0 times
  11. March 22 2017

    Consider upgrading WCR ramps to meet new ADA standards (2 crossing located here) Library Access

    Liked 0 times
  12. March 22 2017

    Consider upgrading WCR ramps to meet new ADA standards (1 crossing located here) Bus stop located here

    Liked 0 times
  13. March 22 2017

    Consider upgrading WCR ramps to meet new ADA standards (2 crossing located here)

    Liked 0 times
  14. March 22 2017

    Consider upgrading WCR ramps to meet new ADA standards. (6 crossing located at this intersection)

    Liked 0 times
  15. March 22 2017

    Consider upgrading WCR Ramps to meet new ADA standards.

    Liked 0 times
  16. March 22 2017

    Consider upgrading WCR ramps to meet new ADA standards. (4 cossings located at intersection)

    Traffic signals could be upgraded to include new APS pushbuttons at each crossing

    Liked 0 times
  17. March 22 2017

    Upgrade existing WCR ramps to comply with current ADA standards (4 crossings in intersection). Also consider adding PED button or HAWK

    Liked 0 times
  18. March 22 2017

    Upgrade existing access ramps to comply with current ADA standards (2 crossings in intersection)

    Liked 0 times
  19. March 21 2017

    155 Mill St. Currently being remediated and prepped for development 2017. Liekly to include greenspace and walkable area.

    Liked 1 time
  20. March 21 2017

    This is the future site of the Greater Gardner Business Incubator. Effort should be made to make access from downtown to here as user-friendly as possible to encourage free flow of bicycle, car and foot traffic and pub. trans. at the discretion of candidates.

    Liked 0 times
  21. March 21 2017

    This point on this awkward intersection is a bus stop for public school students.

    Liked 0 times
  22. March 21 2017

    Upgrade existing access ramps to comply with current ADA standards (5 crossings in intersection)

    Liked 0 times
  23. March 21 2017

    Crosswalk leads pedestrians directly into an existing driveway rather than onto an ADA compliant ramp. Upgrade pedestrian crosswalk

    Liked 0 times
  24. March 21 2017

    By adding a curbed extension where there is just paint currently, parking will be controlled and pedestrians will be more visible and safe while crossing Main Street

    Liked 0 times
  25. March 21 2017

    Improve pedestrian access on west side of Main Street at NW & SW corners to include new ADA ramps

    Liked 0 times