Comments for “Palmer Complete Streets Prioritization”

← Back to the map

Comments Box

Please be as specific as possible

Your Information

This information is optional and will not be displayed.

  1. April 18 2018

    Geometric changes should be made to square off the intersection.

    Liked 0 times
  2. January 30 2018

    Install Speed Feedback Sign (southbound direction)

    Liked 0 times
  3. January 30 2018

    Install Speed Feedback Sign along Ware Street (northbound direction)

    Liked 0 times
  4. January 30 2018

    Install traffic light at intersection of bridge and north main to improve safety of all vehicles.

    Liked 1 time
  5. January 30 2018

    We need a mirror to see oncoming traffic at the stop sign here. Pulling out from the stop sign on baptist hill to continue on baptist hill, you cannot see. Traffic from baptist hill to Burlingame is extremely dangerous. I have almost been hit by a school bus, even after a complete stop. The mountain is a 100% view obstruction even when following traffic laws to the T.

    Liked 0 times
  6. January 30 2018

    Public sidewalk is too many inches above street level, causing damage to vehicles when turning into driveway. Town owned sidewalk should be lowered/fixed.

    Liked 0 times
  7. January 30 2018

    Please pave this street. It has never been paved, always patched. We don’t need lights or anything else. These huge potholes are wearing out my car

    Liked 0 times
  8. January 30 2018

    Street lights on Anderson Street would be wonderful as there is only one way down at the bottom near the Main Road, and NONE on the rest of the street. Manybealk out of the woods and into the woods. No outside lighting on many of the homes either, so sidewalks are not lit up at all either. Safety concern. Especially when kids go to bus stop in the dark in certain seasons.

    Liked 0 times
  9. January 30 2018

    Added crosswalks and signage for everyone to safely cross

    Liked 0 times
  10. January 30 2018

    Connect the main park and island together removing the stretch of road between. Make geometric upgrades to the Park Ave and Front St intersection.

    Liked 0 times
  11. January 30 2018

    Stop sign on corner of Prospect and Oakland.

    Liked 0 times
  12. January 15 2018

    Add sidewalk

    Liked 0 times
  13. January 15 2018

    Add lighting at crosswalks along N Main Street in Palmer

    Liked 1 time
  14. January 15 2018

    Traffic calming needed to slow speeding vehicles

    Liked 1 time
  15. January 12 2018

    Park Street crossing at Rite Aid property including new ADA compliant ramps, pavement markings and signage; Installation of new lighting along existing path connecting Park Street to Converse Street; Intersection of Converse and Walnut Street including new ADA compliant ramps at each corner, pavement markings and signage; Intersection of Central and Park Street including new ADA compliant ramps at each corner, pavement markings and signage; Intersection of Walnut and Pleasant Street including new ADA compliant ramps at each corner, pavement markings and signage

    Liked 1 time
  16. January 12 2018

    Upgrades at several intersections along North Main Street between King Street and Randall Street including Shaw Street, Rockview Street, Holbrook Street, Brown Street and east of King Street. Improvements include installation of new ADA compliant ramps, pavement markings and advanced signage

    Liked 1 time
  17. January 12 2018

    Geometric upgrades, installation of new ramps to meet current standards, pavement markings and signage

    Liked 2 times
  18. January 12 2018

    Upgrades including new ADA compliant ramps at all four corners, pavement markings and signage

    Liked 2 times
  19. January 12 2018

    Geometric and signal upgrades, ADA compliant ramps, pavement markings, signage

    Liked 1 time
  20. January 12 2018

    Geometric improvements to the intersection, installation of new ADA compliant ramps, new pavement markings, new signage

    Liked 0 times
  21. January 12 2018

    Install new cement concrete sidewalk along High Street from the High School access road to existing walk just east of Michael Drive

    Liked 0 times
  22. January 12 2018

    Widen existing hot mix asphalt path that connects the sidewalk along Main Street to the High School access road, install new lights along path

    Liked 0 times
  23. January 12 2018

    Installation of new pedestrian operated signal, new ADA compliant ramps, new markings, new signage

    Liked 0 times
  24. January 12 2018

    Geometric improvements to intersection, installation of new ADA compliant ramps, new pavement markings and advanced signage

    Liked 1 time
  25. January 12 2018

    Reconfigure existing paved width to accommodate new cement concrete sidewalk that connects Palmer Road with Springfield Street and on-street parking, new ADA compliant ramps, new pavement markings and signage

    Liked 1 time