  1. January 12 2018

    Installation of new trailhead to include new crushed stone parking surface, bollards, information kiosk and wayfinding signage

    Liked 0 times
  2. January 12 2018

    Geometric improvements, new pavement markings and signage

    Liked 0 times
  3. January 12 2018

    Geometric improvements to improve sight distance and installation of new cement concrete sidewalk along west side of South Main Street from Pine Street to 1st Street, new pavement markings and signage

    Liked 0 times
  4. January 12 2018

    Installation of new advanced warning signs at each approach

    Liked 2 times
  5. January 12 2018

    Geometric improvements to improve sight distance, installation of new hot mix asphalt berm, mill and overlay existing hot mix asphalt pavement, new pavement markings and signs

    Liked 1 time
  6. January 12 2018

    Installation of new pedestrian hybrid beacon (HAWK) between Wilbraham St and Randall St, new ADA compliant ramps, pavement markings including crosswalk and advanced warning symbols and advanced warning signage to improve pedestrian access across North Main Street

    Liked 1 time
  7. January 12 2018

    Installation of new curb extension along south side of road, upgrades to existing ramps to meet current standards, new APS pushbuttons, new countdown timers, pavement markings and signage

    Liked 1 time
  8. January 12 2018

    Upgrade existing ramps to meet current standard, geometric improvements to accommodate turning movements while reducing overall crossing distance of Thorndike Street, traffic signal upgrades to include APS pushbuttons, countdown timers

    Liked 1 time
  9. January 12 2018

    Installation of new separate bicycle lanes in each direction along Main Street from Knox Street to South Main Street including pavement markings and signage

    Liked 0 times
  10. January 12 2018

    Installation of new hot mix asphalt sidewalk along north side of street beginning at intersection with Shearer Street to meet existing sidewalk easterly to meet existing sidewalk at driveway to No. 1186 Thorndike

    Liked 1 time
  11. January 12 2018

    Installation of new cement concrete sidewalk along west side of street from the intersection with Main Street to Palmer District Court driveway

    Liked 0 times
  12. January 12 2018

    Upgrades to NW corner to provide minimum access along sidewalk behind existing utility pole

    Liked 0 times
  13. January 12 2018

    Installation of new ADA compliant ramps at two locations providing access from the north side to the south side of the street, new pavement markings and advanced signage

    Liked 0 times
  14. January 12 2018

    Traffic signal upgrades including new APS pushbuttons, new steel bollards to separate pedestrians from adjacent parking lot to the Palmer Technology Center

    Liked 0 times
  15. January 12 2018

    Installation of new cement concrete sidewalk and granite curb around perimeter of park to connect to existing paths within park. Reconfigure existing parking along south side of park to create head-in parking and improve capacity

    Liked 0 times
  16. January 12 2018

    Installation of new single mid-block crosswalk to replace existing two crosswalks. Installation of new ADA compliant ramp along north side of street and new curb extension/ADA compliant ramp along south side of street. Remove existing pavement markings, installation of new pavement textured surface and new advanced warning signs

    Liked 1 time