Comments for “Heppner Transportation System Plan”

← Back to the map

Comments Box

Please be as specific as possible

Your Information

This information is optional and will not be displayed.

  1. March 02 2018

    Create a walk/bike path to the Golf Course from Riverside St on the old Railroad Path that is now an irrigation pipe line. Do not try to extend past the Golf Course.

    Liked 1 time
  2. March 02 2018

    Add foot bridge next to the road bridge for safer crossing. There is not a direct route from Residential Sidewalk on Gale St to Heritage Park's Sidewalks. The road bridge is too narrow for two cars and pedestrians.

    Liked 0 times
  3. March 02 2018

    Connect the sidewalk from baseball field to Fuller Canyon than around to Riverside to then reconnect (making a loop).

    Liked 1 time
  4. March 01 2018

    Repair E Willow St Roadway

    Liked 0 times
  5. March 01 2018

    Repair the Gale Street Road

    Liked 0 times
  6. March 01 2018

    Add Pedestrian/Bike Path over the Creek from Morgan St to Riverside near new CCS building.

    Liked 0 times
  7. March 01 2018

    Need to finish the sidewalks on Riverside to continue to Fuller Canyon Rd.

    Liked 1 time
  8. March 01 2018

    I would like the sidewalks to join up with the existing sidewalk on the right hand side of the road. The parking lot and City Maintenance Building and continuing onto Gale is not safe for walkers/strollers/ADA.

    Liked 1 time
  9. March 01 2018

    Visibility for drivers entering the highway from Quaid is very low. You have to stop then go into the crosswalk to see then slowly proceed. This is also a main area where kids cross the street and there is not a crosswalk or safe way. The proposed design will help and I feel is the number one issue in town.

    Liked 1 time