Comments for “Existing Pedestrian Facilities_Space Coast TPO Bicycle and Pedestrian Master Plan”

← Back to the map

  1. Stringio

    Added October 18 2018

    No sidewalk on south side of Hibiscus Blvd. between the two existing businesses (the area in front of the electrical substation).

  2. Stringio

    Added October 18 2018

    No sidewalk on south side of Hibiscus Blvd. from the FEC Railroad to Waverly Place.

  3. Stringio

    Added October 18 2018

    No sidewalk on the north side of Hibiscus Blvd. from US 1 to Medical Park drive.

  4. Stringio

    Added October 18 2018

    A sidewalk does not exist on the north side of the causeway.

  5. Stringio

    Added October 18 2018

    There are no sidewalks along Woody Burke Drive. The paths that can be seen from the road are private facilities.

  6. Stringio

    Added October 18 2018

    The sidewalk/trail on the west side of Evans Rd. does not extend north of the entrance to Erna Nixon Park.

  7. Stringio

    Added October 18 2018

    The sidewalk on the east side of US 1 ends at Carolin Street.

  8. Stringio

    Added October 18 2018

    A sidewalk has been constructed on the north side of Thomas Barbour Dr. from Ballard Park to Royal Palm Dr.

  9. Stringio

    Added October 18 2018

    The bike path has been extended from the existing path to Lipscomb Street (north side of the road).

  10. Stringio

    Added October 18 2018

    No sidewalk on the west side of Airport Blvd. in this area.

  11. Stringio

    Added October 18 2018

    A sidewalk exists, but it is substandard in width and is not well maintained.