Comments for “Pittsfield Complete Streets Prioritization ”
-
Street needs to be repaved. Very poor condition.
Liked 0 times -
undefined
Would be nice to fix the sidewalk that the handicapped folks are getting access to . 148 down to 180 Appleton have very dangerous tar patches that you call a sidewalk .
Liked 0 times -
undefined
The yellow things on the corners of Cherry and Tyler and Pine and Tyler need to go. They make turning into and out of those streets pretty difficult especially if anyone is in the oncoming lane and/or someone parked on the same side you are trying to turn into or out of. Not sure what they are for but they are causing more trouble than helping anything.
Liked 0 times -
undefined
It is great Lincoln is getting done as it is needed badly but also Cherry and Maple St have some pretty bad potholes that should be addressed as well and Cherry St in its entirety should be redone as well as Burbank St which are all in pretty poor condition.
Liked 0 times -
undefined
Really need curbing done on the odd side of Connecticut ave from allendale rd. To dalton ave to stop major erosion at edge of rd into our yards
Liked 0 times -
Several heaves and many pot holes. Hawthorne has massive pot holes as well. The bridge at the end is falling apart as well.
Liked 0 times -
undefined
This is just a suggestion, put some groves in the center lane on the curve of Wahconah St (vicinity of Gulf gas station). This way drivers will be more aware when they cross or drive on the center line. Something like the grooves on Route 8 in Lanesboro & Cheshire along the breakdown lane. No wide or deep grooves, just enough for drivers to feel.
Liked 0 times -
-
undefined
Beverly Street, which is off of Williams Street has drainage issue where water puddles on the west side of Beverly Street, just south of Andover Street. This drainage issue seems to be aggravating an already failing pavement surface in this area. Reconstruction of this section of road including grading and drainage improvements should be considered.
Liked 0 times -
undefined
New sidewalks are being discussed for what seems to be the leg between Leona Drive and Kara Drive. Please include the proper funds in this are to tackle the slope and existing drainage outlet. This area current has a fairly steep slope leading down to a substantial drainage outlet. This drainage outlet may need to be extended and the slope may have to be filled in, to accommodate the sidewalk in this area.
Liked 0 times -
Sidewalk gap. No sidewalk on Williams from Leona to Dalton Division Road
Liked 0 times -
Sidewalk gap. No sidewalk on Williams from Holmes to Elm.
Liked 0 times -
Sidewalk gap. Sidewalks on either side of Park from Wahconah to Seymour, but no sidewalks on either side from Seymour to Beech.
Liked 0 times -
Sidewalk gap. Sidewalk consistent on Eastside of Onota Street from West Street until the cemetery. No sidewalk on either side from cemetery to Pecks Road.
Liked 0 times -
Sidewalk gap. No sidewalks on either side of Devonshire. Lots of commercial driveways.
Liked 0 times -
Sidewalk gap. No sidewalks on either side of Brighton from Elberon to Dalton.
Liked 0 times -
Sidewalk gap. Sidewalk consistently on Eastside of Brighton but inconsisten on Westside from Windsor to Elberon.
Liked 0 times -
Sidewalk gap. No sidewalks on either side from Allengate to Windsor.
Liked 0 times -
Sidewalk gap. No sidewalks on either side of Kensington Ave from Elberon to Dalton.
Liked 0 times -
Sidewalk Gap. No sidewalks on either side of Yorkshire Ave from Elberon to Dalton. Some commercial driveways.
Liked 0 times -
Sidewalk gap. No sidewalks on either side of Windsor with 3-4 exceptions along the entire stretch.
Liked 0 times -
Sidewalk gap on both sides of Ridgeway from Windsor Ave to Elberon.
Liked 0 times -
Sidewalk gap on either side of Elberon.
Liked 0 times -
Sidewalk gap on Northside of Elberon. No Sidewalk on either side of street.
Liked 0 times -
Sidewalk ends briefly from the corner of Pittsfield on Elberon down two or three houses on the Southside.
Liked 0 times