Comments for “Pittsfield Complete Streets Prioritization ”

← Back to the map

Comments Box

Please be as specific as possible

Your Information

This information is optional and will not be displayed.

  1. November 16 2020

    Street needs to be repaved. Very poor condition.

    Liked 0 times
  2. March 29 2019

    undefined

    Would be nice to fix the sidewalk that the handicapped folks are getting access to . 148 down to 180 Appleton have very dangerous tar patches that you call a sidewalk .

    Liked 0 times
  3. March 28 2019

    undefined

    The yellow things on the corners of Cherry and Tyler and Pine and Tyler need to go. They make turning into and out of those streets pretty difficult especially if anyone is in the oncoming lane and/or someone parked on the same side you are trying to turn into or out of. Not sure what they are for but they are causing more trouble than helping anything.

    Liked 0 times
  4. March 28 2019

    undefined

    It is great Lincoln is getting done as it is needed badly but also Cherry and Maple St have some pretty bad potholes that should be addressed as well and Cherry St in its entirety should be redone as well as Burbank St which are all in pretty poor condition.

    Liked 0 times
  5. March 28 2019

    undefined

    Really need curbing done on the odd side of Connecticut ave from allendale rd. To dalton ave to stop major erosion at edge of rd into our yards

    Liked 0 times
  6. March 21 2019

    Several heaves and many pot holes. Hawthorne has massive pot holes as well. The bridge at the end is falling apart as well.

    Liked 0 times
  7. March 20 2019

    undefined

    This is just a suggestion, put some groves in the center lane on the curve of Wahconah St (vicinity of Gulf gas station). This way drivers will be more aware when they cross or drive on the center line. Something like the grooves on Route 8 in Lanesboro & Cheshire along the breakdown lane. No wide or deep grooves, just enough for drivers to feel.

    Liked 0 times
  8. March 14 2019

    undefined

    Add sidewalk from Toronita to Kearney

    Liked 0 times
  9. March 12 2019

    undefined

    Beverly Street, which is off of Williams Street has drainage issue where water puddles on the west side of Beverly Street, just south of Andover Street. This drainage issue seems to be aggravating an already failing pavement surface in this area. Reconstruction of this section of road including grading and drainage improvements should be considered.

    Liked 0 times
  10. March 12 2019

    undefined

    New sidewalks are being discussed for what seems to be the leg between Leona Drive and Kara Drive. Please include the proper funds in this are to tackle the slope and existing drainage outlet. This area current has a fairly steep slope leading down to a substantial drainage outlet. This drainage outlet may need to be extended and the slope may have to be filled in, to accommodate the sidewalk in this area.

    Liked 0 times
  11. March 05 2019

    Sidewalk gap. No sidewalk on Williams from Leona to Dalton Division Road

    Liked 0 times
  12. March 05 2019

    Sidewalk gap. No sidewalk on Williams from Holmes to Elm.

    Liked 0 times
  13. March 05 2019

    Sidewalk gap. Sidewalks on either side of Park from Wahconah to Seymour, but no sidewalks on either side from Seymour to Beech.

    Liked 0 times
  14. March 05 2019

    Sidewalk gap. Sidewalk consistent on Eastside of Onota Street from West Street until the cemetery. No sidewalk on either side from cemetery to Pecks Road.

    Liked 0 times
  15. March 05 2019

    Sidewalk gap. No sidewalks on either side of Devonshire. Lots of commercial driveways.

    Liked 0 times
  16. March 05 2019

    Sidewalk gap. No sidewalks on either side of Brighton from Elberon to Dalton.

    Liked 0 times
  17. March 05 2019

    Sidewalk gap. Sidewalk consistently on Eastside of Brighton but inconsisten on Westside from Windsor to Elberon.

    Liked 0 times
  18. March 05 2019

    Sidewalk gap. No sidewalks on either side from Allengate to Windsor.

    Liked 0 times
  19. March 05 2019

    Sidewalk gap. No sidewalks on either side of Kensington Ave from Elberon to Dalton.

    Liked 0 times
  20. March 05 2019

    Sidewalk Gap. No sidewalks on either side of Yorkshire Ave from Elberon to Dalton. Some commercial driveways.

    Liked 0 times
  21. March 05 2019

    Sidewalk gap. No sidewalks on either side of Windsor with 3-4 exceptions along the entire stretch.

    Liked 0 times
  22. March 05 2019

    Sidewalk gap on both sides of Ridgeway from Windsor Ave to Elberon.

    Liked 0 times
  23. March 05 2019

    Sidewalk gap on either side of Elberon.

    Liked 0 times
  24. March 05 2019

    Sidewalk gap on Northside of Elberon. No Sidewalk on either side of street.

    Liked 0 times
  25. March 05 2019

    Sidewalk ends briefly from the corner of Pittsfield on Elberon down two or three houses on the Southside.

    Liked 0 times