Comments for “SCTPO_BPMP_Improvements”

← Back to the map

Comments Box

Please be as specific as possible

Your Information

This information is optional and will not be displayed.

  1. June 11 2019

    FISKE BLVD. (SR 519)

    Do we mention the SR 519 Corridor Study? These gaps should be filled in the resurfacing, but isn't confirmed

  2. June 11 2019

    Complete Street goes to Oleander St.

  3. June 11 2019

    SR 524

    Do we mention the 524 corridor study anywhere?

  4. June 11 2019

    SINGLETON AVE.

    Titusville MMP identifies Singleton from SR 405 to Greenbriar

  5. June 11 2019

    SINGLETON AVE.

    Can we add this gap via the Titusville MMP

  6. June 11 2019

    KNOX MCRAE DR.

    Sidewalk gap noted in Titusville MMP. Can we just add it as a sidewalk gap?

  7. June 11 2019

    SISSON RD.

    Included in Titusville MMP. (SR 405 to Little League Lane)

  8. June 11 2019

    SR 50

    Included in Titusville MMP (Helen Hauser Blvd to SR 405)

  9. June 11 2019

    GRANT RD.

    Did we only decide to add Micco and not Grant? Do you recall the reasoning?

  10. June 11 2019

    undefined

    The asphalt path along this corridor was built at 8 foot. Due to lack to maintenance I am sure that it was showing as less in the google review

  11. June 11 2019

    undefined

    Sidewalk is present. Looks to be covered by trees in google.