Comments for “Central Avenue Transit-Oriented Development (TOD) Implementation Project”

← Back to the map

Comments Box

Please be as specific as possible

Your Information

This information is optional and will not be displayed.

  1. December 14 2011

    Add sidewalks on addison...poor lighting

  2. December 14 2011

    Ped crossing needed here

  3. December 14 2011

    Confusing intersection

  4. December 14 2011

    Midblock crossing

  5. December 14 2011

    Bike lanes

  6. December 14 2011

    better streetscape and maintenance

  7. December 14 2011

    Bike lanes

  8. December 14 2011

    Neighborhoods are better walking with less trafficand with sidewalks

  9. December 14 2011

    Planned shopping center

  10. December 14 2011

    Neighborhoods are hilly, Capital Avenue is the most direct

  11. December 14 2011

    Building here that is potentially being renovated

  12. December 14 2011

    existing school bus stop

  13. December 14 2011

    existing speed bumps

  14. December 14 2011

    No walking on Central

  15. December 14 2011

    Wider sidewalks and school bus stops needed on Central

  16. December 14 2011

    Rolling Ridge drive can be a bypass of Addison/Central

  17. December 14 2011

    Add signal

  18. December 14 2011

    Raised crosswalk or bridge

  19. December 14 2011

    need to slow down cars, lots of pedestrians

  20. December 14 2011

    Existing bus stops no bus stops

  21. December 14 2011

    Need to locate bus stops at intersections, hard to see sidewlakers

  22. December 14 2011

    Sidewalks on Addison and better lighting and drainage

  23. December 14 2011

    Potential to widen addison with new development

  24. December 14 2011

    New connection to Karen Boulevard

  25. December 14 2011

    Congested intersection