Comments for “Downtown Meridian Pedestrian and Bicycle Plan”
-
Should have sidewalks by a school.
-
Sidewalks should be infront of the school for safety.
-
Complete southside sidewalk on Fairview to Locust Grove.
-
Southside sidewalks on Fairview needs to be completed allong the full length of Avenue.
-
Fairview sidewalk on Southside needs to be completed all the way.
-
Danger to kids walking to high school from cherry direction (side of road very small).
-
Bike lane needed on E Pine fro 5th to Lucust Grove. Need space due to traffic on this street.
-
Replace sidewalk from corner of Pine and north to school connecting old and new.
-
Sidewalk on Washington between Meridian to 7th; lots of senior citizens in this area :).
-
Prepare for Linder overpass with multilane pathway.
-
Prepare for Meridian interchange rebuild with sidewalk.
-
Prepare for Meridian interchange rebuild with sidewalk.
-
Complete sidewalks on 8th from Pine to Cherry.
-
I would like to see sidewalks along this section of 2nd St so that the street is not mistaken for a parking lot for the senior center (food bank).
-
Complete the sidewalk on W. 4th St.
-
Fill in sidewalks on Fairview and add bike lanes if possible.
-
Add sidewalk connection between 5th St and New City Pathway on Northside of Pine.
-
Replace and widen sidewalks on Pine Ave from 5th to Main St.
-
Replace the sidewalk and make it the same width from school to Pine Street.
-
Multi-use pathway to and over Linder overpass.
-
Bike route all of Cherry Lane and Fairview (continuous).
-
Connect gap. Connect new File Mile Creek pathway to Locust Grove in sidewalk.
-
Need crossing at park.
-
Improve bike lanes in downtown.
-
Future rail with trail - auto crossings.