Comments for “Downtown Meridian Pedestrian and Bicycle Plan”

← Back to the map

Comments Box

Please be as specific as possible

Your Information

This information is optional and will not be displayed.

  1. June 08 2012

    Should have sidewalks by a school.

  2. June 08 2012

    Sidewalks should be infront of the school for safety.

  3. June 08 2012

    Complete southside sidewalk on Fairview to Locust Grove.

  4. June 08 2012

    Southside sidewalks on Fairview needs to be completed allong the full length of Avenue.

  5. June 08 2012

    Fairview sidewalk on Southside needs to be completed all the way.

  6. June 08 2012

    Danger to kids walking to high school from cherry direction (side of road very small).

  7. June 08 2012

    Bike lane needed on E Pine fro 5th to Lucust Grove. Need space due to traffic on this street.

  8. June 08 2012

    Replace sidewalk from corner of Pine and north to school connecting old and new.

  9. June 08 2012

    Sidewalk on Washington between Meridian to 7th; lots of senior citizens in this area :).

  10. June 08 2012

    Prepare for Linder overpass with multilane pathway.

  11. June 08 2012

    Prepare for Meridian interchange rebuild with sidewalk.

  12. June 08 2012

    Prepare for Meridian interchange rebuild with sidewalk.

  13. June 08 2012

    Complete sidewalks on 8th from Pine to Cherry.

  14. June 08 2012

    I would like to see sidewalks along this section of 2nd St so that the street is not mistaken for a parking lot for the senior center (food bank).

  15. June 08 2012

    Complete the sidewalk on W. 4th St.

  16. June 08 2012

    Fill in sidewalks on Fairview and add bike lanes if possible.

  17. June 08 2012

    Add sidewalk connection between 5th St and New City Pathway on Northside of Pine.

  18. June 08 2012

    Replace and widen sidewalks on Pine Ave from 5th to Main St.

  19. June 08 2012

    Replace the sidewalk and make it the same width from school to Pine Street.

  20. June 08 2012

    Multi-use pathway to and over Linder overpass.

  21. June 08 2012

    Bike route all of Cherry Lane and Fairview (continuous).

  22. June 08 2012

    Connect gap. Connect new File Mile Creek pathway to Locust Grove in sidewalk.

  23. June 08 2012

    Need crossing at park.

  24. June 08 2012

    Improve bike lanes in downtown.

  25. June 08 2012

    Future rail with trail - auto crossings.