Comments for “Downtown Meridian Pedestrian and Bicycle Plan”

← Back to the map

  1. Stringio

    Added June 08 2012

    Should have sidewalks by a school.

  2. Stringio

    Added June 08 2012

    Sidewalks should be infront of the school for safety.

  3. Stringio

    Added June 08 2012

    Complete southside sidewalk on Fairview to Locust Grove.

  4. Stringio

    Added June 08 2012

    Southside sidewalks on Fairview needs to be completed allong the full length of Avenue.

  5. Stringio

    Added June 08 2012

    Fairview sidewalk on Southside needs to be completed all the way.

  6. Stringio

    Added June 08 2012

    Danger to kids walking to high school from cherry direction (side of road very small).

  7. Stringio

    Added June 08 2012

    Bike lane needed on E Pine fro 5th to Lucust Grove. Need space due to traffic on this street.

  8. Stringio

    Added June 08 2012

    Replace sidewalk from corner of Pine and north to school connecting old and new.

  9. Stringio

    Added June 08 2012

    Sidewalk on Washington between Meridian to 7th; lots of senior citizens in this area :).

  10. Stringio

    Added June 08 2012

    Prepare for Linder overpass with multilane pathway.

  11. Stringio

    Added June 08 2012

    Prepare for Meridian interchange rebuild with sidewalk.

  12. Stringio

    Added June 08 2012

    Prepare for Meridian interchange rebuild with sidewalk.

  13. Stringio

    Added June 08 2012

    Complete sidewalks on 8th from Pine to Cherry.

  14. Stringio

    Added June 08 2012

    I would like to see sidewalks along this section of 2nd St so that the street is not mistaken for a parking lot for the senior center (food bank).

  15. Stringio

    Added June 08 2012

    Complete the sidewalk on W. 4th St.

  16. Stringio

    Added June 08 2012

    Fill in sidewalks on Fairview and add bike lanes if possible.

  17. Stringio

    Added June 08 2012

    Add sidewalk connection between 5th St and New City Pathway on Northside of Pine.

  18. Stringio

    Added June 08 2012

    Replace and widen sidewalks on Pine Ave from 5th to Main St.

  19. Stringio

    Added June 08 2012

    Replace the sidewalk and make it the same width from school to Pine Street.

  20. Stringio

    Added June 08 2012

    Multi-use pathway to and over Linder overpass.

  21. Stringio

    Added June 08 2012

    Bike route all of Cherry Lane and Fairview (continuous).

  22. Stringio

    Added June 08 2012

    Connect gap. Connect new File Mile Creek pathway to Locust Grove in sidewalk.

  23. Stringio

    Added June 08 2012

    Need crossing at park.

  24. Stringio

    Added June 08 2012

    Improve bike lanes in downtown.

  25. Stringio

    Added June 08 2012

    Future rail with trail - auto crossings.