Comments for “Ocala Marion TPO 2045 LRTP Needs List”

← Back to the map

Comments Box

Please be as specific as possible

Your Information

This information is optional and will not be displayed.

  1. May 14 2020

    R16

    We need to start planning the northern expansion of this new road to run parallel to the Interstate. The development of the Baldwin ranch is key to future economic development in the region. This road would open up 500 additional acres for industrial development

    Liked 0 times
  2. April 30 2020

    In Public Transit, PT9, change the Facility to "SR200/VA, New Local Services."

    Liked 0 times
  3. April 30 2020

    In Public Transit, Add a New Circulator Service: Downtown/Mid-town/Hospital.

    Liked 0 times
  4. April 30 2020

    In Public Transit, Project ID PT31, Restroom facility. Change "location TBD" to "Union Station."

    Liked 0 times
  5. April 30 2020

    Add - New interchange at SW 20th and I-75

    Liked 0 times
  6. April 30 2020

    SIS111

    This interchange is already in the TIP and FDOT Work Program to be completed in FY 24/25.

    Liked 0 times
  7. April 28 2020

    Future SR 40 widening from Silver Springs to E side of the Ocklawaha River includes a multi-use paved trail segment.

    Liked 0 times
  8. April 28 2020

    Widening of SR 200 from CR 484 towards Withlacoochee River needs to be prioritized for funding. could do first 2.5 miles across state owned conservation lands for recreational trail and wildlife connectivity. FDOT has acquired ROW already and design or roadway is completed.

    Liked 0 times
  9. April 23 2020

    ITS: From SR 200 to SR 464 is not mapped correctly.

    Liked 0 times
  10. April 23 2020

    Termini is incorrect. 2040 LRTP Need Plan stopped at NE 36th Ave. Extension of the corridor is at TPO discretion, but NE 35th Street ceases to be a paved public road as it curves to the south to connect with SR 40.

    Liked 0 times
  11. April 23 2020

    There are two widening segment projects on SR 40. 1) From End of four lanes to CR 314 and 2) From CR 314 to 314A. (Are they still listed in the Needs Assessment?)

    Liked 0 times
  12. April 23 2020

    Commerce Park Road/McGinley Road (New Road) Should be added to the E+C Network (Contact MC Eng for GIS file 352-671-8686)

    Liked 0 times
  13. April 23 2020

    Foot print of the corridor is not correct. Please contact MC Eng for GIS file 352-671-8686. Should end upl aligning with SW 49th Ave

    Liked 0 times
  14. April 23 2020

    NE 35th Street: From CR 200A to NE 25th Ave: Widen to four lanes (Marion County Work Program)

    Liked 0 times
  15. April 23 2020

    Add NE 35th Street: From 600' west of West Anthony Road to CR 200A: Widen to four lanes. (Marion County Work Program)

    Liked 0 times
  16. April 23 2020

    NW 70th Ave from US 27 to NW 43rd St/NW 49th Street (New East/West Road Illustrated on map): Widen to four lanes

    Liked 0 times
  17. April 23 2020

    NW 70th/80th Ave: Widen to four lanes from SW 80th Street o US 27. Marion County project to support the World Equestrian Center

    Liked 0 times
  18. April 23 2020

    Marion Oaks Blvd to Marion Oaks Dr should be included as it is currently an unfinished segment.

    Liked 0 times
  19. April 23 2020

    R22

    The footprint and both termini on this project are incorrect. Please consult MC Eng for GIS file. 671-8686

    Liked 0 times