The path on the North side of SW 24th in front of Avalon is dangerous and needs to be repaired ASAP. The sidewalk on the South side of 24th has been closed for 6 months despite the construction being past the Haile Publix entrance. The workers appear to be storing equipment and supplies on the sidewalk which keeps it closed unnecessarily.
Need a safe way to get from Duckpond to Sweetwater Park across University Ave.
There are many pedestrians here that frequently cross at this intersection to get to and from the park. Unfortunately, there are no painted crosswalks or pedestrian crossing signs. Painting crosswalks and adding a pedestrian crossing sign that can flash with a button press is imperative for pedestrian safety.
Please mark the crosswalks at NW 12th Street and NW 8th Avenue.
Please pave the sidewalk on the west side of SW 13th Street between Inner Road and Museum Road. I know UF plans to build a sidewalk parallel to the road here on campus. That is nice but is no substitute for a paved sidewalk in the right of way. This is a ridiculous location to have no paved sidewalk!
Please mark crosswalk on the east side of the intersection of NW 4th Street and NW 8th Avenue.
Please mark the crosswalk on the west side of the intersection of NW 2nd Street and NW 8th Avenue. The only pave sidewalk south of 8th Avenue is on the west side of 2nd Street and only the crosswalk on the east side of the intersection is marked. Can we just mark all of the crosswalks?!? Hopping from one side of the other to either be on a paved sidewalk or a marked crosswalk is exhausting and seems pretty rediculous!
Please mark the crosswalks at NW 1st Street and NW 8th Avenue.
Can we mark the crosswalks at NW 8th Avenue and NW 3rd Street?
Can we mark the crosswalks at N Main Street and NW/NE 2nd Avenue?
Can we mark the crosswalk on the south side of the intersection of N Main Street and NW/NE 4th Avenue? I like that we marked the crosswalk on the north side of the intersection. Why not also mark the crosswalk on the south side?!
Can we mark the crosswalks at N. Main Street and NW/NE 6th Avenue?
Can we please mark the the crosswalks at N. Main Street and NW/NE 7th Avenue?
Continue to make connection to SW 23rd Ter MUT
Green Acres Park/Clear Lake Park trails
Connect NW 31st Ln to NW 23rd Ave (preferably sooner than waiting on development in area)
On the Western half of this stretch of 13th street there is simply no sidewalk. There is a dirt ditch along the side of one of the most busy streets in the city in some of the densest areas in the county. Please put a sidewalk here. Additionally it is adjacent to student housing.
We need more pedestrian walkway to recreation centers, like Clear Lake.
There needs to be a tie in on this map to the bus routes.
A side walk is needed starting on 34th near the fire station and onto 13th to the home depot. Crosswalks at the intersections of 34th and 13th (people walking to and from work at ups/amazon) and a crosswalk at the intersection of 53rd and 13th goi g to homedepot.
Add a pedestrian crossing on NW 6th St. to Curia.
Make an off-road unpaved trail connecting Ring Park to NW 20th St.
There is an existing pedestrian crossing and paved path into the cemetary here. Would it be possible to get ten private land ownere to make a connection at NW 29th Pl?
Will there be a pedestrian crossing here (and at all major ped-network/road intersections)?
Please add Utility Corridor Path per Jenn G.