Comments for “Mesa Transportation Master Plan”

← Back to the map

Please be as specific as possible

Your Information

This information is optional and will not be displayed.

  1. April 10 2023

    Very dangerous intersection for cyclists, pedestrians to go from the multi use path at Elliott and the 202. You have to go from the North East side of the intersection to the South West side with no way to safely connect the path. No clear path, markings or signs. Very dangerous.

  2. April 10 2023

    No bike lane, no sholder for cyclists along Crismon (both north and south for 1/2 mile) from Main St. going both directions. Choke point for cyclists and no room for cars.

  3. April 07 2023

    Green light to cross Brown Road at Sterling entrance to Red Mountain Park does not stay green long enough for older pedestrian to cross without attempting to run.

  4. April 07 2023

    Sidewalks needed

  5. April 07 2023

    No lights on north side of University! Also very narrow bike lane makes for a dangerous bicycle commute

  6. April 07 2023

    This is unusable to commute west by bicycle, there are no lights on the north side of baseline!

  7. April 07 2023

    Is this multi use paths EVER going to safely connect to anything?

  8. April 07 2023

    The bike lane here is ignored by drivers since the connection to the 24 opened

  9. April 07 2023

    The bike lane here is narrow and dangerous

  10. April 07 2023

    How am I supposed get here safely by bicycle from East Mark?

  11. April 06 2023

    This existing facility is not identified on the Master Plan

  12. April 06 2023

    Light rail makes getting around downtown mesa a challenge to the point that going downtown is not enjoyable anymore.

  13. April 02 2023

    Rough pavement makes bicycling jarring. Would appreciate smoother pavement in bike lane.

  14. April 02 2023

    Faster response to pedestrian activation. Otherwise pedestrian and cyclists will cross on a gap.

  15. April 01 2023

    Extend light rail to Power Rd

  16. April 01 2023

    No bus service on Broadway Road

  17. April 01 2023

    Long wait to cross Main Street (north south) due to timing of light rail. Shade needed at intersections while waiting for light

  18. March 30 2023

    Impatient drivers running red lights especially those making left hand turns

  19. March 30 2023

    Many accidents at this intersection

  20. March 30 2023

    Many accidents at this intersection

  21. March 30 2023

    Many accidents at this intersection

  22. March 28 2023

    Need public transport and Dial a Ride service serig Brown Rd and the 202 freeway

  23. March 26 2023

    Mesa needs a stop near downtown for Intercity rail, commuter rail with fast track service to DT PHX and Tucson

  24. March 26 2023

    Would love to see high density housing/mixed use TOD similar to Culdesac here in these large vacant/decrepit lots along the light rail

  25. March 26 2023

    Extend Streetcar to Mesa Riverview and Spring Training Fields