Comments for “Yuma Transportation Survey”

← Back to the map

Please be as specific as possible

Your Information

This information is optional and will not be displayed.

  1. May 30 2024

    Using the unused "filled in" B canal 3.7 lateral to create a multi-modal pathway going from E. Palo Verde St. in the south to Kennedy Park in the north and continuing north to meet up with Redonda Center Dr. in the north would help to complete the multi-modal loop around Yuma.

    Liked 2 times
  2. May 29 2024

    Multi-use pathways:
    Use the lateral to connect from Kennedy Park to E. 26th Pl.
    Create a multi-use pathway from Kennedy to Redondo Dr.

    Liked 7 times
  3. May 29 2024

    8th Street from Pacific Avenue to Giss Pkwy. and continuing to Avenue B does not consider bike safety.

    Liked 4 times