Comments for “Yuma Transportation Survey”

← Back to the map

Comments Box

Please be as specific as possible

Your Information

This information is optional and will not be displayed.

  1. July 18 2024

    Barriers separating the new bike path and the vehicle travel lanes would be beneficial.

    Liked 2 times
  2. July 18 2024

    S Arizona Ave needs a bike path on both sides.

    Liked 1 time
  3. July 18 2024

    Whoever designed the sidewalk from S Fortuna Ave to S Arizona Ave really messed up. It's not straight and the wheelchair access points lead directly into E 32nd St.

    Liked 0 times
  4. July 18 2024

    The bike path from here to S Avenue 3 E needs to be ripped up and redone.

    Liked 1 time
  5. July 18 2024

    Yuma needs an additional exit from the interstate. This location would be optimal to connect to hwy 95.

    Liked 1 time
  6. July 18 2024

    Adding oning's and water stations along the canals for safety. I ride from the foothills to the city (14 miles) for work, even in the summer.

    Liked 1 time
  7. July 18 2024

    Adding oning's and water stations along the canals for safety. I ride from the foothills to the city (14 miles) for work, even in the summer.

    Liked 0 times
  8. July 18 2024

    As with other comments, the canals make for great paths for biking. Keeping with safety in mind. I don't necessarily believe they need to be paved, just kept up better, harder packed. A lot are loose dirt/sand making it difficult to get through, even using a mountain bike.

    Liked 1 time
  9. July 18 2024

    Widening the space next to the gate so you don't have to dismount your bike.

    Liked 1 time
  10. July 18 2024

    Widening the space next to the vehicle gate so you don't have to dismount your bike.

    Liked 0 times
  11. July 18 2024

    A bike path from Fortuna to Emerald Rd (through the desert) would be nice. Most of the paths are to sandy. I think a great spot for the bike path is under the power lines.

    Liked 2 times
  12. July 18 2024

    The bike path stops after the Ron Watson Middle School. The needs to be extended on both sides all the way to S Ave 9E.

    Liked 1 time
  13. July 18 2024

    S 4th Ave has one bike/golf cart lane on the west side. A separate bike lane only on both sides is needed. Also vehicles exiting the RV lots on the west side don't stop till they already are in the sidewalk. Additional signage warning of pedestrians need to be placed. Stop signs should be moved back to make sure vehicles stop twice, once before the crossing lane and then they can enter it if there are no pedestrians in the area.

    Liked 2 times
  14. July 18 2024

    I ride my bike on the canal as part of my route to work. Having to go to the intersection to use the crosswalk/walk sign is out of the way, and on the west side there is no easy way to get on the sidewalk on your bike without getting off. I think a pedestrian crossing signal at the canal is appropriate as there are many pedestrians who utilize the canal and cross Araby there, having to wait for an opening in traffic.

    Liked 0 times
  15. July 17 2024

    The section from 12th St. to 8th St. has no bike lanes, and cars pass by without slowing down in many instances while we have to share the road.

    Liked 2 times
  16. July 16 2024

    Restripe 1st Street to three lanes and add bike lanes on the roadway with on street parking. The lack of a center turn lane on this roadway creates rear end collisions and impedes traffic.

    Liked 0 times
  17. July 16 2024

    Reduce the speed limit on Avenue B to 35 mph. Speed limit varies and need to be consistent through the city. Additionally, neighboring residents, businesses and Supervisor Pancrazi have made the request.
    Speed kills and we should be finding ways to make our community safer.

    Liked 0 times
  18. July 16 2024

    Construct sidewalk along Avenue A from hospital to 32nd Street.

    Liked 2 times
  19. July 16 2024

    Construct a sidewalk on the north side of 32nd Street between 4th Avenue going east to the 32nd Street curve.

    Liked 0 times
  20. July 16 2024

    Need a multi-use path connection from the East Canal Path to 12th Street.

    Liked 1 time
  21. July 16 2024

    Need a paved connection to the East Main Canal bike path on the south side of the basin on 14th Avenue south of 8th Place.

    Liked 1 time
  22. July 16 2024

    Put in sidewalks on Pacific Avenue in this area. It is unsafe and a particular hazard for those with disabilities.

    Liked 0 times
  23. July 16 2024

    Signalize Magnolia Avenue with left turn lanes and allow u-turns. Make Dora Avenue and Gateway Drive right in/right out with raised medians. Magnolia and not Gateway because there are more houses south of 16th Street and connections to Avenue B and 24th Street.
    The center median has many traffic conflicts. Additionally, drivers are making unsafe left turns into oncoming traffic from Gateway, Magnolia and Dora.

    Liked 0 times
  24. July 16 2024

    Construct a muti-use path from Avenue 3E to Avenue 8 1/2E.

    Liked 4 times
  25. July 16 2024

    Need to reduce speeds on 14th Avenue between 8th Street and 16th Street with traffic calming measures. There have been numerous instances of vehicles leaving the roadway and crashing into the neighboring houses.

    Liked 0 times