Tree lined, lighted walking path. So people can exercise more.
Crosswalk is needed. Hard to cross 24th when walking.
Crosswalk needed near the bus stops.
Speed bumps are needed alongside park because the cars speed like they’re in a freeway. Kids and pets are playing in the area.
Traffic light or a 3-way stop sign is needed, also a pedestrian crosswalk
A light pole and vegetation at this intersection block the view when trying to turn left.
Add dual WBLTL and right turn lanes at intersection.
Add right turn lanes
Traffic Interchange located on (Exit 9) needs to be re-evaluated by ADOT and included in the YMPO LRTP update. Access to I-8 to go west is not convenient. Road users must travel west on 32nd st up to 8E to take Interstate 8 Frontage Rd to loop around and access I-8 to go westbound or head east for 2-3 miles to loop west around on Fortuna Rd. Mayor development is happening in the area. This will increase accessibility, improve safety, and reduce congestion in the area.
Provide a safer crossing of walking and bike trail system.
COmplete ultimate intersection at Ave D with 8th Street with right slip lane and corresponding raise island. Allow a future west main canal trail system to cross safely.
Add right turn lanes.
Modernize canal path with proper crossing of 1st Street. Figure out if the trail can take some asphalt width or a new bridge is needed. This is a major bottleneck in the bike path system.
Widen west leg of 32nd Street and Ave B intersection to reduce bottleneck and reduce congestion. More traffic is heading west and needs more than a single lane. Build ASAP! Include full modern right turn lanes.
Finish the ultimate 5 lane section of 24th Street. Keep green bike crossing and multiple use path crossings safe!
Improve west leg of 24th Street and Ave B to reduce congestion home, to parks and back. Area is a bottleneck and needs multiple lanes added to modernize this hodge-podge intersection.
Install right turn lanes and improve sight distance.
Improve this intersection to prepare when traffic increase along 40th Street and the future bridge over ASH 195.
Finish the 7 lane roadway section at this bottleneck and install the final bike route missing leg. Then paint the bike lanes in all the way to Pacific Ave (2E)
Finish the 7 lane roadway section at this bottleneck and install the final bike route missing leg. Then paint the bike lanes in all the way to Pacific Ave (2E)
36th Street is the major bike route collector for east/west traffic. Please make these bike lanes continuous from the A Canal to Fortuna Road. Yes, this includes Stetson Ave and a few course corrections.
Add NB right turn lane.
Add right turn lanes.
Add right turn lanes
Add right turn lanes.